精品国产乱码久久久久APP下载 ,啊灬灬用力灬嗯灬3p黑人,gogo大胆午夜人体视频网,45分钟做受片免费观看

Product & Service

Adding Grounding test column for GZ Metro Line 3


There is a large amount of maintenance in the Low voltage cabinet. The original equipment has not fully considered the grounding wire hanging position during the overhaul and brought big inconvenience to the daily overhaul. 

After full assesment on the equipment, we design a complete plan and add Grounding device for Guangzhou Metro Line 3.







eee.png


ttt.png
451.jpg



Engineer mounting the 

equipment.


Part of the detail




Succesfully adding the 

Grounding Device